• 0 Posts
  • 2 Comments
Joined 1Y ago
cake
Cake day: Jun 09, 2023

help-circle
rss

21 panels and very simple layout. The longest part was building the frame to hold the panels. Installing the inverters etc. took a little time and our town is a little strict when it cones to construction. This is a very good installer which doesn’t rush things just to move on to the next job.


It’s mostly just time consuming. It took 5 days to get the solar installed on our roof.